Engineers love numbers. We use them to design bridges, determine loads, evaluate stresses, and generally make sense of the physical world. It should come as no surprise, then, that we’ve also developed an elaborate system of numbers to tell us how our bridges are doing.
Some go from 1 to 4. Others go from 0 to 9. And just to keep things interesting, the Federal Highway Administration (FHWA) has 23 different metrics to evaluate whether we’re inspecting bridges properly.
Confused yet? Don’t worry. There’s a method to the madness.
Element Condition States 1 to 4
At its most granular level, bridges are made up of elements. The type of deck that you drive on is an element. The girders that support that deck is another element. The pier cap that supports the girders is another element. And so on.
When a bridge inspector enters a new bridge into the National Bridge Inventory (NBI), they are breaking the bridge up into discrete elements. Each element is then quantified – how many columns do I have, how many square feet of deck is there, how many linear feet of girder are there? Think of this like your driver’s license. Some of your features, like height and eye color, never change. The number of columns probably won’t change and actually help define the bridge.

Once a baseline quantity is established for each element, the inspector then sets about dividing that total quantity into four Condition States:
- Condition State 1 is the best, no defects beyond inherent defects left over from fabrication or construction.
- Condition State 2 is considered fair; the defect is minor in nature now but will be monitored over time to see if it gets worse
- Condition State 3 is considered poor; the defect is moderate in nature. This could be previously minor defects that have progressed. Concrete has spalled but there is no loss of strength. Steel is corroded, but no measurable section loss is evident.
- Condition State 4 is considered severe; this defect is major in nature. The defect has progressed beyond moderate. We now have a reduction in strength or performance due to section loss.
The sum of the quantities in each Condition State will equal the baseline total. We now know the condition of that bridge element relative to when the bridge was new, and if FHWA guidance is followed, relative to the rest of the country.
OK, so what do we do with those numbers?
Component Condition Ratings 0 to 9
On a bridge, we have three components: Deck, Superstructure, and Substructure. Each Component is made up of one or more Elements.

For example, we might have a bunch of columns, some linear feet of pier cap, and some linear feet of abutment. Columns, pier caps, and abutments are each considered Elements. But collectively, they make up the Substructure of the bridge.
After the inspector has completed their inspection, they are going to have three different Elements with varying amounts of quantity in one of the four Condition States. Somehow, they will need to consolidate that Element Level data into one Component Condition Rating for the Substructure.
To do this, FHWA has given the inspector some criteria, in the form of Table 20 of the Specifications for the National Bridge Inventory (SNBI), affectionately known as Snooby.
Table 20 requires the inspector to assess prevalence and severity.
Prevalence is somewhat subjective and is left up to the individual owners and inspectors to decide. FHWA guidelines gives three broad terms to use – Isolated, Some, and Widespread. One way to think about this is in terms of percentages. If I have a girder spall measuring two feet long on a bridge with 1200 total linear feet of girders, I’d probably call that an Isolated defect since that is less than 1% of the total. Conversely, if I had spalling on over half the total girder length, that would probably be characterized as a Widespread defect. FHWA has steered away from establishing hard percentages, and this is just one way of illustrating how an inspector might assess the extent of deterioration.
Severity is a bit more defined. FHWA guidelines gives us three broad terms to use – Minor, Moderate, and Major. The inspector already determines this when they divvy up the total Element quantity into the Condition States. One way to think about this is to consider CS2 as Minor, CS3 as Moderate, and CS4 as Major.
From this we can classify the various Element Level defects by prevalence and severity. Our abutments might be Isolated Minor. Our pier caps might be Some Moderate. Our columns might be Widespread Moderate. After that, it’s like a game of poker…which Element controls? To determine that, we refer to Table 20.

In order to be categorized as Good, having a Component Condition Rating of 7 or above, the Substructure must at worst only have Some Minor defects. Since we have Moderate defects on two of our elements, the inspector could not categorize this Substructure as Good.
In order to be considered as Fair, having a Component Condition Rating of 5 or 6, the Substructure must at worst only have Some Moderate defects. We’re getting closer. We definitely have Moderate defects in two of our Elements, but the column prevalence is Widespread. So the inspector cannot categorize this Substructure as Fair.
Now that we know we’re in the Poor range, we can narrow it down between Poor, Serious, Critical, or something worse. A rating of 3 would be Serious, but this requires Major defects. Luckily, we don’t have any of those yet. So we’re not at a 3 or worse, which pushes us into 4, or Widespread Moderate.
It should go without saying that an open bridge is a safe bridge. Regardless of its rating, a bridge that is known to be unsafe will be closed. The rating system functions to help asset managers determine where and when to spend transportation dollars on infrastructure. By providing granular data, an asset manager will be able to tell, relative to all other assets, how bad the condition is and what the problem is.
For example, if I have 20 bridges and 10 are Good, 8 are Fair, and 2 are Poor, I should probably be prioritizing those two Poor bridges for improvement over the other 18 bridges based on condition, all other things being equal. And because I have element level data for all of my bridges, I can tell at a glance that the girders on one bridge and the columns on another are driving their respective ratings.
National Bridge Inspection Program Compliance Metrics 1 to 23
We’ve now assigned numbers to the defects, and numbers to the bridge components. But who’s making sure we’re assigning the right numbers in the first place? Naturally, FHWA has a few more numbers for that.
The Code of Federal Regulations (CFR) provides the legal framework for the National Bridge Inspection Program (NBIP). Under this framework, each state is required to identify and inspect each bridge within their boundaries on a regular basis. 23 CFR 650 Subpart C, also known as the National Bridge Inspection Standards (NBIS), provides the rules the states must follow. Enforcement of the NBIS is given by Congress to FHWA.
Broadly speaking, there are four main parts to the NBIS – Qualifications, Intervals, Procedures, and Inventory. To provide oversight, FHWA created 23 individual metrics by which to assess each state’s compliance with the NBIS. A review is conducted annually of the state’s programs, known as the NBIP Compliance Review.
There are three main metrics devoted to Qualifications of NBIP personnel. A Program Manager that has overall responsibility for the program, a Team Leader who must be on site during all inspections, and a Diver who conducts underwater dive inspections, all of whom must meet certain training, credential, and education requirements to be deemed qualified for their particular roles.
There are five metrics devoted to Intervals for inspections. States are permitted to adjust inspection intervals, but adjustments must meet CFR requirements and FHWA approval. States are assessed on whether Routine, Underwater, Non-Redundant Steel Tension Member (NSTM) inspections, and other Special inspections are conducted on time.
Eleven metrics are devoted to inspection procedures. These include load rating procedures, procedures for posting or restricting a bridge, along with procedures for the actual inspection types.

Each bridge is required to have a bridge file, a repository for all documents related to a bridge. Procedures also address scour, critical findings, and the quality of inspections. Within broad guidance, each state is responsible for setting their own procedures under each metric, usually contained in an inspection manual but occasionally each individual bridge might have a specific procedure.
Two metrics address the actual bridge inventory. States must identify and collect certain basic information on each bridge in their jurisdiction. This data is contained within a database. Along with the condition data collected by the inspectors, the entire inventory data is submitted to FHWA annually and forms the basis for the compliance review. The state is also responsible for updating the data in a timely manner.
A catch all metric is the inspection organization metric. This metric assesses whether the program has a PM, whether it is tracking the qualifications of the NBIP personnel, and whether it is performing its job as prescribed by the NBIS.
FHWA will assess each compliance metric, submitting a report that notes whether the state is compliant or not compliant. Through stewardship, FHWA can help correct deficiencies with the program and foster improvement. Continued serious deficiencies can result in withholding federal funding.
And that’s Bridge Inspection by numbers – 4, 10, 23! Any bridge can be assessed with just three numbers. For almost 60 years, this numerical approach has provided a simple, practical, and efficient way to assess the nation’s bridges, keep them safe, and identify what needs to be fixed. And like murder, it’s as easy to learn as your ABCs.